Water & Sewer Main Replacement Program - 2011
Updated 5/25/12
Contractors:
Lazaro Paving: General Contractor
Fenton & Sons: Subcontractor - Water and Sewer Utilities.

Project Manager:
Hardik Raval, Engineer, Water/Sewer Division 978-318-3250, hraval@concordma.gov

Project Overview:
Concord Public Works has completed water and sewer improvements in Hubbard, Union, Fielding, Willow and part of Belknap Streets.  The construction sequence consisted of a two phase process.  The first phase included replacing antiquated sewer and undersized water mains.  The second phase was the reconstruction of the roadway surface to improve roadway drainage and overall drivability.  The majority of the work was completed through mid-November 2011. Final “top course” paving and loam & seeding is scheduled to be completed by summer of 2012.

Click here to see the location of the project
Click here to see the work on Roads and Drainage

The water main work involved replacement of 6-inch cast iron pipe with 8-inch ductile iron pipe, and replacement of the water services from the main to each house’s property line; in the streets of Union, Fielding and a section of Belknap.  The sewer main involved replacement of 6-inch clay pipe with an 8-inch PVC sewer pipe and replacement of sewer services from the main to each house’s property line; in Hubbard, Willow, Fielding and Union Streets.

Purpose of the project
The purpose of the project was to replace antiquated and undersized infrastructure.  Replacing the 6-inch water main with 8-inch water main improves water quality and fire flows. Replacing the old undersized sewer main reduces number of sewer surcharges by reducing stormwater inflow and groundwater infiltration into the sewer system.

See Details of the Water/Sewer work below:

Hubbard Street
About 320 feet of 6-inch clay sewer pipe was replaced with 8-inch PVC pipe.

DSC01852a.jpg
Deep Sewer being installed at the X-ing of Thoreau & Hubbard Street.

Union Street

About 385 feet of 6-inch 1966 Cast Iron water pipe was replaced with 8-inch Cement Lined Ductile Iron pipe.


About 170 feet of 6-inch clay sewer pipe was replaced with 8-inch PVC pipe, from Hubbard St. to Willow St.  About 50 ft. of sewer was extended from Fielding St. towards Willow St.


Willow Street
About 290 feet of 6-inch clay sewer pipe with 8-inch PVC pipe.


DSC01689.jpg
DSC01699.jpg
Sewer Main Being Installed
Sewer Manhole Waiting to be Installed


Fielding Street
About 415 feet of 6-inch 1966 Cast Iron water pipe was replaced with 8-inch Cement Lined Ductile Iron pipe.


About 415 feet of 6-inch clay sewer pipe was replaced with 8-inch PVC pipe.






DSC01682.jpg
DSC01694.jpg
Sewer Main Being Installed
Sewer Service Being Installed

Belknap Street
About 370 feet of 6-inch 1930 Cast Iron water pipe was replaced with 8-inch Cement Lined Ductile Iron pipe.



 
Website Disclaimer

Privacy Statement
Virtual Towns & Schools Website
Internal Server Error

Internal Server Error

Folder template for specified resource /pages/ConcordMA_PublicWorks/watersewerprojects could not be sent. (reason: 1015)