Water & Sewer Main Replacement Program - 2011
Contractors:
Lazaro Paving: General Contractor
Fenton & Sons: Subcontractor - Water and Sewer Utilities.

Project Manager:
Hardik Raval, Engineer, Water/Sewer Division 978-318-3250, hraval@concordma.gov

Project Overview:
Concord Public Works will begin roads improvements in the neighborhood of Hubbard, Union, Fielding and Willow Streets, beginning September 12, 2011.  The construction sequence consists of a two phase process.  The first phase includes replacing antiquated sewer and undersized water mains.  The second phase will be the reconstruction of the roadway surface to improve roadway drainage and overall drivability.  The majority of the work will be completed through mid-November, with final “top course” paving and loam & seeding scheduled to be completed in the spring of 2012.

Click here to see the location of the project
Click here to see the work on Roads and Drainage

The water main work will involve the replacement of an existing 6-inch cast iron pipe with 8-inch ductile iron pipe, and replacement of the water services from the main to each house’s property line; in the streets of Union, Fielding and a section of Belknap.  The sewer main work involves replacement of an existing 6-inch clay pipe with an 8-inch PVC sewer pipe and replacement of sewer services from the main to each house’s property line; in Hubbard, Willow, Fielding and Union Streets.

Purpose of the project
The purpose of the project is to replace antiquated and undersized infrastructure.  Replacing the 6-inch water main with 8-inch water main will improve water quality and fire flows. Replacing the old undersized sewer main will reduce number of sewer surcharges by reducing stormwater inflow and groundwater infiltration into the sewer system.

Construction Impacts
Work Day:  Work will be limited to Monday through Friday, excluding holidays, between the hours of 7:00AM and 5:00 PM, on weekdays.
 
Traffic: Impacts are expected only within the immediate neighborhood of the project. Vehicles may have difficulties accessing the roads during work hours, 7:00AM to 5:00PM.  The roads will be restored or plated each night to allow full access to all vehicles when work is not in progress.  Please note that mail trucks, and emergency vehicles will always be allowed access.
 
Water/Sewer Service:  Residents along Hubbard, Union, Fielding and Willow Streets can expect an occasional interruption in service, for a short duration.   Specific notice will be provided at least 24 hrs. in advance of any scheduled interruption.

See details of the water/sewer work below:

Hubbard Street
Replace about 320 feet of 6-inch clay sewer pipe with 8-inch PVC pipe.

Update 12/1/11

Fenton and Sons has completed installation of sewer in Hubbard St.  With this the installation of water and sewer infrastructure in Hubbard, Willow, Fielding and Union Streets is complete.  The General Contractor Lazaro Paving has started paving of the roads in this neighborhood.

DSC01852a.jpg
Deep Sewer being installed at the X-ing of Thoreau & Hubbard Street.

Union Street

Replace about 3855 feet of 6-inch 1966 Cast Iron water pipe with 8-inch Cement Lined Ductile Iron pipe.

Update 10/20/11
Fenton and Sons has finished installation of 385 feet of 8-inch Cement Lined Ductile Iron Pipe.  All the properties have been connected to the new water main.  The temporary bypass water pipe has been dismantled.


Replace about 170 feet of 6-inch clay sewer pipe with 8-inch PVC pipe, from Hubbard St. to Willow St.  Extend about 50 ft. of sewer from Fielding St. towards Willow St.


Update 11/15/11

Fenton and Sons has finished installation of sewer in Union St.   In total about 220 ft. of 8 inch PVC sewer main was installed.

Willow Street
Replace about 290 feet of 6-inch clay sewer pipe with 8-inch PVC pipe.


Fenton and Sons has finished installation of sewer in Willow St.  In total about 290 ft. of 8-inch PVC sewer main was installed.


DSC01689.jpg
DSC01699.jpg
Sewer Main Being Installed
Sewer Manhole Waiting to be Installed


Fielding Street
Replace about 415 feet of 6-inch 1966 Cast Iron water pipe with 8-inch Cement Lined Ductile Iron pipe.


Update 10/20/11
Fenton and Sons has finished installation of 415 feet of 8-inch Cement Lined Ductile Iron Pipe.  All the properties have been connected to the new water main.  The temporary bypass water pipe has been dismantled.

Replace about 415 feet of 6-inch clay sewer pipe with 8-inch PVC pipe.

Update (10/20/11):
Fenton and Sons has finished installation of 8-inch PVC sewer main in Fielding Street.  Two new sewer manholes were also installed in the street.  All the properties are now connected to the new sewer main.






DSC01682.jpg
DSC01694.jpg
Sewer Main Being Installed
Sewer Service Being Installed

Belknap Street
Replace about 370 feet of 6-inch 1930 Cast Iron water pipe with 8-inch Cement Lined Ductile Iron pipe.

The sub-contractor Fenton and Sons will commence this work in the spring of 2012.  The residents will be notified in advance of the construction work.


 