Roads and Sidewalk Program
(Updated 11/5/13)
2012-2013 Roads Program -

The contractor's  work crews will be finalizing punchlist items over the course of the next couple of weeks such as cleanup, some loam and seeding etc. We anticipate the final paving of Brook Trail Road in October. 


This is the List of Roads included in the 2012-2013 Roads Program:

Street Segment
Treatment
L(Ft)
Sudbury Rd (Train Tracks - Rte. 2)
Prep & Overlay - A/C
3600
Elsinore St.
Reclaim & Pave - Local
3180
Grant St.
Reclaim & Pave - Local
970
Belknap St (Thoreau St. to Elsinore St)
Reclaim & Pave - Local
1800
Brooks St.
Reclaim & Pave - Local
630
Pond St
Reclaim & Pave - Local
533
Byron St
Reclaim & Pave - Local
190
Laws Brook Rd (Hse 328 - Town Line)
Prp & Ovrly - A/C
1715
Brook Trail Rd (Main St - Hayward Mill Rd)
Prp & Ovrly/FB - Local
1070
Total Miles of Road
3
*Powder Mill Road has two treatments proposed.
Reclaim Areas:  Stone Root Ln. to 441' W of Stone Root Ln & 670' E Old Pickard Rd to Old Pickard Rd
Prep and Overlay Area:  441' W of Stone Root Lane to 670' E of Old Pickard Lane
----------------------------------------------------------------------------------------------------------------------------------------
2013 Sidewalk/ADA Compliance Program

CPW is nearing the completion of the 2013 Sidewalk and ADA Improvements Program.  Crews will be installing loam/seed and performing final clean-up at Fox Lane, Thoreau Street, Monument Square, Bartlett Hill Road, and the Bedford Street/Old Bedford Road ADA Ramps.

The following was completed as part of the Program:

 Sidewalk work included Commonwealth Avenue (Route 2 to 378 Commonwealth Avenue), Fairhaven Road (Concord Academy Athletic Fields to Adin Drive), Thoreau Street (150’ East of Sudbury Road to CCHS Drive), Rideout Playground (Conant Street to Playground Area), Fox Lane, Bartlett Hill Road (connection to Reformatory Branch Trail), and Monument Square.  Additionally, the Program included the installation of new ADA compliant ramps on Old Bedford Road and Bedford Street from the Bedford Town Line to Monument Square, and at several downtown locations on Main Street, Walden Street, Court Lane, and Monument Street. 
-----------------------------------------------------------------------------------------------------------------------------------------
 
 2013-2014 Roads Program -

CPW is pleased to commence with the 2013/14 Roads Program.  The preliminary roads on the list for the program are: Fitchburg Turnpike, Baker Avenue (Elm Street to the cul-de-sac), Saw Mill Road, Gifford Lane, Allen Farm Lane, Crescent Road, Garland Road, Hosmer Road, Wilson Road, and Nashoba Road (400-feet east of Garland Road through the cul-de-sac), a portion of Elm Street (Main Street – Bridge), Caterina Heights, and a portion of Powder Mill Road (Stone Root Lane – Old Pickard). 

Update:  11/5/13

Wednesday:

·        Begin paving in the Crescent/Nashoba Nbhood
·        Continue to Fine Grade and compact in the Baker Ave Nbhood

Thursday:

·        Complete paving in the Crescent/Nashoba Nbhood (if not raining)

Friday:

·        “Rain Date” to Complete paving in the Crescent/Nashoba Nbhood

Paving Brook Trail Rd will be scheduled for mid next-week.

As usual the schedule is subject to change based on delays and weather


This is the List of Roads to be treated in the 2013-2014 Roads Program:

Street Segment
Treatment
L(Ft)
Powder Mill Rd (Stone Root Ln - Old Pickard)*
Reclaim/Prep & Overlay - A/C
2160
Allen Farm Lane
Reclaim & Pave - Local
1540
Elm St (Main St. to Bridge)
Prep & Overlay - A/C
1195
Gifford Lane
Reclaim & Pave - Local
975
Baker Ave**
Reclaim/Prep & Overlay - A/C
1950
Saw Mill Rd.
Reclaim & Pave - Local
690
Crescent Rd.
Reclaim & Pave - Local
1730
Garland Rd.
Reclaim & Pave - Local
680
Wilson Rd.
Prep & Overlay - Local
1085
Nashoba Rd (360' E of Garland to Cul-de-Sac)***
Reclaim/Prep & Overlay - Local
1720
Caterina Heights
Prep & Overlay - Local
4295
Hosmer Rd.
Reclaim & Pave - Local
710
Fitchburg Tpk. (Rte. 117)
Mill & Overlay - A/C
3175
*POWDER MILL RD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
STONE ROOT LN. to 441' W OF STONE ROOT LN. & 670' E OLD PICKARD RD. to OLD PICKARD RD.
PREP AND OVERLAY AREA:
441' W OF STONE ROOT LN. to 670' E OF OLD PICKARD LN.
**BAKER AVE HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
GIFFORD LN. THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
ELM ST to GIFFORD LN
***NASHOBA ROAD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
WILSON RD THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
300'E OF GARLAND to WILSON RD
NOTE
APPROXIMATELY 1.4 MILES OF CAMBRIDGE TURNPIKE WILL BE TREATED
WITH RECLAIM & PAVE - A/C FROM LEXINGTON RD to RTE. 2


You may contact the Engineering Division at 978-318-3210 with any questions.