Roads and Sidewalk Program
updated 8/22/14
 2013-2014 Roads Program -

This is the List of Roads to be treated in the 2013-2014 Roads Program:

Street Segment
Treatment
L(Ft)
Powder Mill Rd (Stone Root Ln - Old Pickard)*
Reclaim/Prep & Overlay - A/C
2160
Allen Farm Lane
Reclaim & Pave - Local
1540
Elm St (Main St. to Bridge)
Prep & Overlay - A/C
1195
Gifford Lane
Reclaim & Pave - Local
975
Baker Ave**
Reclaim/Prep & Overlay - A/C
1950
Saw Mill Rd.
Reclaim & Pave - Local
690
Crescent Rd.
Reclaim & Pave - Local
1730
Garland Rd.
Reclaim & Pave - Local
680
Wilson Rd.
Prep & Overlay - Local
1085
Nashoba Rd (360' E of Garland to Cul-de-Sac)***
Reclaim/Prep & Overlay - Local
1720
Caterina Heights
Prep & Overlay - Local
4295
Hosmer Rd.
Reclaim & Pave - Local
710
Fitchburg Tpk. (Rte. 117)
Mill & Overlay - A/C
3175
*POWDER MILL RD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
STONE ROOT LN. to 441' W OF STONE ROOT LN. & 670' E OLD PICKARD RD. to OLD PICKARD RD.
PREP AND OVERLAY AREA:
441' W OF STONE ROOT LN. to 670' E OF OLD PICKARD LN.
**BAKER AVE HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
GIFFORD LN. THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
ELM ST to GIFFORD LN
***NASHOBA ROAD HAS TWO TREATMENTS PROPOSED:
RECLAIM AREAS:
WILSON RD THROUGH CUL-DE-SAC
PREP AND OVERLAY AREA:
300'E OF GARLAND to WILSON RD
NOTE
APPROXIMATELY 1.4 MILES OF CAMBRIDGE TURNPIKE WILL BE TREATED
WITH RECLAIM & PAVE - A/C FROM LEXINGTON RD to RTE. 2

Week of 8/25-8/29

 Baker Ave Neighborhood

·        Raise natural gas gate structures
·        Pave Top course of pavement (8/26 & 27)

 Crescent St Neighborhood

·        Pave top course of pavement (8/27 & 28)

 Elm St

·        Install Catch Basin
·        Pave top course of pavement (8/28 or 8/29)

 Commonwealth Ave

·        Mill pavement (8/25 & 26) PARTIAL ROAD CLOSURE
·        Raise Utility Structures




You may contact the Engineering Division at 978-318-3210 with any questions.