11/03/08 to 11/14/08

1) LGMF at exterior walls.
2) Install over head MEP at 196'level.
3) Install over head MEP at 189'-8" and 184'
4) Install roof at south elevation from 1 to 14 lines
5) Install HVAC roof curbs.
6) Install exterior wall sheathing.
7) Install flashing details at windows on north elevation.
8) Install thu wall flashing at north elevation.
9) Install FIP insulation at north elevations.
10) Exterior veneer walls at G, 10.5, E, 12, 14 lines.
11) Install duct enclosure at gym roof. ( OMR should issue PR for extra work as shown on SKA-233, 234, 235)
12) Install GFCMU at 202'-4" and 189'-8"
13) Install boilers at mechanical room.
14) Form and place Auditorium stairs.
15) Install sloped shingle roof at Media center and G line of north elevation.
16) Install slope roof at G line, auditorium, media center, and gym. ( Need extra work approved for duct enclosure)
17) Spray fireproofing at media center, 196, and 202'-4"
18) Frame interior partitions at 196' and 189'-8"
19) Install stairs at to roof, mechanical room, and stair C. (Need approved submittal for rail mess.) Fabric and channel.