Sudbury Road

Project:

2017 Roads Program 

General Contractor (Roadway work):

Lazaro Paving Corp.

Sub-Contractor (Drainage work):

James Fenton & Son Contracting, Inc.

 

Contact for Roadway and Drainage Related Matters:

Jacob Zwicker, Assistant Public Works Engineer, Engineering Division 978-318-3210, jzwicker@concordma.gov

Program Background:

The goal of the Town’s annual roads program is to recommend adequate investment in the Town’s 107 mile roadway network to ensure the network does not deteriorate to a point which would result in more costly periodic repairs.  Utility improvement opportunities are also identified and implemented within the roads program when appropriate. This can include drainage replacements or enhancements, water main and sewer main replacements and/or private utility expansions from National Grid (gas main), Verizon (Broadband internet/cable), etc.

Project Overview:

Sudbury Road is part of the 2017 Roads Program bid, which is valued at approximately $1,000,000.00. The project is scheduled to reconstruct 5.4 miles of roadway, reconstruct drainage as needed, and other incidental work.

Sudbury Road Scope of Work

Scope of Work:

This phase of the 2017 Roads Program will begin in the spring/summer of 2017.  In this phase, a portion of Sudbury Road is scheduled for a mill and overlay treatment. This involves the removal of the top course (1.5”) of pavement. Utility castings are then adjusted in addition to other incidental work in preparation for installing 1.5” of new pavement. The reconstruction is then finalized by completing the remaining work which consists of line striping, loam & seeding disturbed roadway shoulders, blending driveway transitions (if necessary), and final clean-up.